Actaeon installs concrete, paver, and permeable driveway systems for residential and commercial properties in Washington DC, Maryland, and Virginia. We handle material selection, excavation, aggregate base preparation, and finished surface installation — including standard and stamped concrete, interlocking pavers, and permeable interlocking concrete paver (PICP) systems that meet county stormwater requirements.
A driveway is one of the highest-impact hardscape elements on a property — it's the first thing you see and one of the highest-traffic surfaces. Material choice and base preparation determine whether it lasts two years or twenty.
Driveway material options
Concrete driveways
Standard broom-finish concrete is the most cost-effective durable driveway option. Properly installed over a compacted stone base with control joints, a concrete driveway lasts 25 to 30 years in the DMV climate. We also install stamped concrete driveways with color and texture to simulate stone or brick patterns at a lower cost than real pavers.
Paver driveways
Concrete or natural stone pavers set over a compacted aggregate base in sand. Higher initial cost than poured concrete but superior repairability — damaged pavers can be replaced individually without cutting and patching. Pavers also handle tree root movement better than monolithic concrete.
Permeable paver systems
Permeable interlocking concrete pavers (PICP) or open-cell grass pavers allow stormwater to infiltrate through the surface rather than running off. Required on some properties with limited lot coverage ratios or stormwater management obligations. Increasingly required or incentivized by county stormwater programs in Maryland and Virginia.
What good base preparation looks like
All driveway types require adequate base depth and compaction. For residential driveways: 6 to 8 inches of compacted aggregate base minimum. For sites with poor subsoil drainage or high clay content, we may recommend deeper excavation and a layer of geotextile fabric before aggregate placement. The base is invisible once the driveway is done — it's also the part most likely to be skipped by low-bid contractors.
What to expect during driveway installation
Most residential driveway projects follow the same sequence: existing surface removal and disposal, subgrade grading and compaction, aggregate base installation and compaction, and finished surface. For concrete driveways, we set forms, place and finish the concrete, and saw control joints at calculated spacing to control where any future cracking occurs. Control joints are what keep a concrete driveway from cracking randomly — they're not optional. For pavers, we set perimeter edge restraints, place and screed the sand bed, lay the pavers, compact the finished surface, and sweep in joint sand.
Paver installations move faster once the base is prepared.
Driveway problems specific to Maryland and Northern Virginia
Maryland's clay soils expand when wet and contract when dry — this seasonal movement works on concrete and paver systems that weren't built with adequate base depth. Frost heave in January through March can lift sections of a driveway that wasn't excavated and compacted correctly. Tree roots growing beneath an older driveway can cause localized heaving and cracking. In those cases, root barriers during installation or a different surface material may be the better long-term answer.
Maryland counties and DC have begun incentivizing or requiring permeable pavement in situations with limited impervious area coverage. Prince George's County and Montgomery County both have programs that credit permeable systems against stormwater management requirements. If your property has a stormwater management obligation or limited lot coverage allowance, we can walk through whether PICP is a better fit than standard concrete or asphalt.